We’re excited to announce the launch of our T Rack Series, a new range of indoor and outdoor battery cabinets designed to simplify installation and optimise performance for our 3RU LiFe4851 batteries. Designed and pre-wired in Melbourne, these fully assembled cabinets are ready to deploy, giving installers a faster and more efficient solution for residential and commercial energy storage systems.
The T Rack Series includes the TIR6, TIR10, and TOR8 cabinet models.
Indoor Rack Options – TIR6 & TIR10:
Our TIR6 and TIR10 cabinets are designed for indoor use, featuring a familiar rack format, reinforced structural support, and pre-wired DEGSON communication wiring. Both models provide optimal airflow for battery longevity and system reliability.
- TIR6: Accommodates up to 6 LiFe4851 batteries.
- TIR10: Supports up to 10 LiFe4851 batteries, offering more capacity while maintaining quick, hassle-free installation.
Outdoor Rack Option – TOR8:
For outdoor installations, our TOR8 cabinet offers robust, low-profile housing with fan-forced cooling, rain-protected ventilation, and a three-point locking system. Designed to accommodate up to 8 LiFe4851 batteries, the TOR8 ensures system performance and safety in exposed conditions with an IP55 rating and marine-grade aluminium construction.
All our cabinets are backed by responsive local support, reflecting our commitment to quality and service.
Launch Bundle – Rack Cabinets + 6 LiFe4851 Batteries
To simplify deployment and save time on-site, we’re offering a limited-time bundle including any of our new cabinets paired with 6 LiFe4851 batteries:
- Total storage: 30.6 kWh (6 x 5.1 kWh LiFe4851 batteries)
- Certified: UL9540A and UL1973
- Flexible operation: Managed or self-managed modes, parallel capability up to 16 modules
- Warranty: 10 years
This bundle provides installers with everything they need in one package, ensuring a compliant, neat, and efficient setup. Both indoor and outdoor cabinet options are available.
Availability: Pre-orders for the launch bundle are open now, with full availability pending CEC approval. Offer valid until 30 June 2026.